Alum Creek rentention boom

Boom Time At The Bridge

by Gary Gardiner on July 21, 2010

A retention boom is lowered into Alum Creek just downstream from the main constrcution site.

The boom is designed to hold back debris from floating downstream toward the city’s spillway dam.

Leave a Comment

Previous post:

Next post: