The level of the coffer dam floor is checked for depth after the emptied hole is partially filled with gravel. The baseball-sized rocks will be the working area as steel pilings are driven into the ground for the western bridge supports.
Checking coffer dam floor level
Previous post: Cable attachment
Next post: Coffer Dam Rebar Ready









