Coffer dam floor levels set and checked

Checking coffer dam floor level

by Gary Gardiner on September 17, 2010

Transit for checking coffer dam floor levelsThe level of the coffer dam floor is checked for depth after the emptied hole is partially filled with gravel. The baseball-sized rocks  will be the working area as steel pilings are driven into the ground for the western  bridge supports.

Leave a Comment

Previous post:

Next post: