The jagged edge of the old Main Street surface is cut away to make a smooth, flat surface for attaching new asphalt for the roadway attached to the new Main Street Bridge as a bulldozer levels the gravel road surface in preparation for Monday’s asphalt layer.
Cutting Main Street for new asphalt roadway
Previous post: Main Street new sidewalks completed
Next post: Asphalt roadway at Main Street Bridge









