A worker stands on a ladder in Alum Creek to apply finishing grout to exposed sections under the new Main Street Bridge where a proposed bike and walkway would be built. Almost all the concrete for the new bridge was poured with the exception of one curved decorative wall that will be completed closer to opening day.
Finishing grout applied to bridge exterior concrete
Previous post: Sealing sidewalks
Next post: Finishing touches applied to concrete abutment surfaces









