Concrete is pumped into the top section of the bridge support structure on the east side of Alum Creek. A worker at left guides the pump hose into position as the worker at right uses a vibrator to settle the cement into the forms.
Footer Completed
Previous post: Culvert Cutting
Next post: Pilings piled for placement









