Post image for Footer Completed

Footer Completed

by Gary Gardiner on October 8, 2010

Concrete is pumped into the top section of the bridge support structure on the east side of Alum Creek. A worker at left guides the pump hose into position as the worker at right uses a vibrator to settle the cement into the forms.

Leave a Comment

Previous post:

Next post: