A lineman rigs a utility pole to temporarily hold overhead wires above the freeway section of the Main Street Bridge construction site. All overhead wires from the previous bridge site will be moved to underground locations for the new bridge giving an unobstructed view of the new structure.
Overhead Wires Moved
Previous post: Underground Work
Next post: Buckets of Rocks









