Post image for Pouring and forming

Pouring and forming

by Gary Gardiner on November 10, 2010

Concrete is pumped into forms for the abutment on the east side of Alum Creek. Standing at right is the wireless controls operator for the concrete pumper as the center worker moves itsĀ  pump tube into an exact position to fill the form. At left is a worker using a vibrator to settle the concrete.

Leave a Comment

Previous post:

Next post: