A retention boom is lowered into Alum Creek just downstream from the main constrcution site.
The boom is designed to hold back debris from floating downstream toward the city’s spillway dam.
A retention boom is lowered into Alum Creek just downstream from the main constrcution site.
The boom is designed to hold back debris from floating downstream toward the city’s spillway dam.
Previous post: Boom Time At The Bridge
Next post: Now There Are Two